Sierra Point

Because the building site for Sierra Point was a former dump site that had been built over San Francisco Bay mud, pile foundations were required. Using the Tru-Frameā„¢ system reduced the structure weight from 1250 tons (the weight of a conventional moment frame) down to 850 tons, which dramatically reduced pile requirements and structure costs.
Brisbane, CA Opus West Corporation Sierra Point LLC 115,000